T&G
        Constructors - Integrity
T&G Analyticstracking
Project By Client

Sand Lake Business Park, Inc.: Sand Lake Business Park Bridge

SITUATION > Sand Lake Business Park contracted T&G to lay the foundation for a new pedestrian bridge, parking lot and other site work.

ACTION > The scope of work included demolition of an existing grass field to be replaced with a new parking lot and new site lighting. T&G formed and poured sidewalk 300’ long by 5’ wide and new oversized pads to support the 104’ long pedestrian bridge. This project required special coordination with utility company. The bridge was set between two High Voltage Distribution Towers that could not be shut down. This added a high level of danger. Weekly inspections with the Saint John’s Water District were performed.

RESULTS > The construction was completed safely, on schedule and within budget. Due to the success of this project, the developer recommended T&G for other projects.